Well Road Overpass Accelerated Bridge Construction

Previous Project | West Monroe, LA

  • Client:

    Louisiana Department of Transportation and Development
  • Service:

    Medium and Short Span Bridges
  • Status:

    Completed
  • Overview

    YouTube Clip: Preserving the Flow

    With urban expansion, traffic on the vital Well Road overpass has steadily increased, necessitating a replacement. LADOTD looked to a trusted partner in Modjeski and Masters to design a replacement.

    M&M provided preliminary and final design services for the replacement of the entire I-20 overpass superstructure using accelerated construction methods. To eliminate long-term construction and closures on the overpass, our innovative solution resulted in an abbreviated construction phase – a single weekend. Prior to the change-out, the new replacement spans were erected on-site at a staging area within the interchange. In addition, substructure units were strengthened while the existing superstructure remained opened to traffic. Next, self-propelled modular transporters (SPMTs) were utilized to remove the old spans and roll-in the new spans. During the weekend lane closure period, interstate traffic was routed through the interchange ramps. M&M also provided traffic control plans, special provisions, and LRFR rating of the structure.

    This was the first time that SPMTs were specified during the design of a bridge replacement project for the LADOTD. Despite inclement weather, the project was successfully completed one day ahead of schedule.
  • Description

    Tasks Performed
    • Bridge Replacement – Design (Preliminary and Final)
    • LRFR Rating
    • Construction Support

    Bridge Description
    • Span Lengths – 55 to 85 feet
    • Total Project Length – 262 feet
    • Lanes on Structure – Two lanes
  • Testimonial

    “This is the first time we’ve done [accelerated construction] of this magnitude, but I think we’re going to do more.” - David Hodnett, Engineer for Louisiana Department of Transportation and Development
  • Credits

    Dr. Zolan Prucz, PE (Project Principal)
    David Petermeier, PE, SE (Project Manager)
    Cullen Ledet, PE (Design Engineer)
    Rachel Mertz, PE, SE (Design Engineer)