X
IH-70 Ramp A
Life-Cycle Engineering Services | EXPANDED

Modjeski and Masters is pleased to announce the acquisition of structural engineering firm Summit Engineering Group, Inc. Our combined engineering prowess and respective technical skillsets will enable us to provide streamlined design and construction solutions to best meet client needs.

Read More
back buttonSegmental Concrete Bridges

Quintana Beach Bridge Design

| Surfside Beach, TX

  • Client:

    Williams Brothers Construction Company
  • Service:

    Segmental Concrete Bridges
  • Status:

    Completed
  • Overview

    State Highway 332 is an important local highway, connecting inland industrial towns of Brazoria, Lake Jackson, and Clute with the port town of Surfside Beach. It also crosses the Gulf Intracoastal Waterway, an essential inland waterway that is naturally protected from open sea travel hazards. As larger vessels travel the waterway more frequently, the original swing-span bridge became an increasingly apparent obstacle. The bridge was also a barrier to emergency evacuation of the residents living on the island across the intercoastal canal during hurricanes that regularly hit the Texas Gulf Coast. To find a solution to these issues, the Texas DOT designed a replacement bridge to simultaneously address vehicular and navigation travel demands.

    Working in conjunction with TxDOT and the contractor, Summit Engineering Group (Summit) provided construction-engineering services to enhance the bridge construction. The bridge was successfully constructed within the project schedule, which greatly enhanced the movement of existing traffic. The new segmental bridge features a 350' main span and a total segmental concrete bridge length of 740'. The remaining 23-span bridge is made up of 142'-long Type VI Modified Prestressed Girders. All segments were single celled, varying in depth from 19' at the pier tables to 8' at the end segments or closure segment.

    Due to positive collaboration with the client, contractor, and affected stakeholders, the project was successfully completed within budget and on schedule. The new bridge addressed local travel demands and will continue to do so for years to come. After the completion of this project, Summit’s parent firm, Modjeski and Masters, Inc. completed the innovative Houma-Freeport Bridge Replacement, which was directly aided by the increased vertical clearance of the Quintana Beach Bridge.
  • Description

      Tasks Performed
    • Value Engineering
    • Construction Engineering
    • Construction Administration
    • Erection Engineering
    • Falsework Design

    Bridge Geometry
    • Length of Main Span – 350 feet
    • Total Project Length – 4,006 feet
    • Lanes on Existing Structure – Two Lanes
  • Testimonial

    Due to positive collaboration with the client, contractor, and affected stakeholders, the project was successfully completed within budget and on schedule. - Gregg A. Reese, PE, President, Summit Engineering Group
  • Credits

     Gregg A. Reese, PE (Project Principal)